Project Description

This project concerns the realisation of the large-scale new-build project ‘Westwijk Zuidwest’ in Amstelveen. It regards phase 4 of the project in which a total of 172 soil-bound houses and 136 apartments are realised.

The following activities have been or are being performed by us for this project:

• Groundwater Act permit with effects study
• Design complete groundwater & distribution & surface water regeneration system
• Various construction permits
• Execution supervision

Groundwater system
Principle: Cold and heat storage system Debit groundwater system: 200 m3/h
Cooling power: 2,088 kW Number of wells: 1 doublet
Heating power: 1,740 kW End depth wells: 140 m
Distribution system
Heat supply: 2,250 MWh
Cold supply: 550 MWh
Full load debit: 385 m3/h
Surface regeneration system
Heat to be supplied: 1,700 MWh
Heating power: 700 kW
Regeneration system debit: 100 m3/h